# Day 21: Roads that sit on the ground

19 November 2026 · LankaVerse · https://lankaverse.meshydra.com/blog/2026-11-19-roads-that-sit-on-the-ground

> Roads on the hills were floating, sometimes by more than 5 m. Both directions now share one height, with retaining walls where the ground falls away.

On the hills round Kandy the roads were floating. Each direction of a road took its height from the ground under its own lane, so on a slope one side hung over the other, sometimes by more than 5 m. Side roads climbed at up to 58%.

Now both directions share one height, side roads are held to a sensible slope, and wherever the ground still falls away under a road edge there is a concrete retaining wall, like on the real hill roads.

A first check on the 148 km of lane in the town core showed how bad it was. At 17% of points the two directions of one road sat at different heights, the worst by 5.3 m. Road hung over the ground by up to 3.4 m on the hillsides. After the new rules, the two directions match (worst under 1 m), and the 61 overhanging points left each get a retaining wall.

![Before: road hanging off the hillside](https://lankaverse.meshydra.com/media/d4-road-before.webp "Before · the road edge hangs over the slope")
![After: road sitting in the hillside](https://lankaverse.meshydra.com/media/d4-road-after.webp "After · the same spot, road sitting in the ground")

Then I checked every lane inside the Kandy boundary: 2,619 lanes, 465 km of lane, 220 named streets. Steep stretches went from 2,072 to 160, bumps and dips from 242 to 41, and only 2 spots of floating road are left. A handful of awkward junctions still fail, and they are on the list.

All 72 Kandy tiles (roads, terrain, buildings, boards and materials) went back into the game in one run with no save errors.