# Day 26: The town fills in: 675 shop units

24 November 2026 · LankaVerse · https://lankaverse.meshydra.com/blog/2026-11-24-the-town-fills-in-675-shop-units

> The first nine builders finished King Street, Trincomalee Street, Cross Street, Hill Street and more. The town went from 113 shop units to 675.

The first batch of nine builders finished in 14 to 28 minutes each: King Street, Trincomalee Street, Cross Street, Hill Street, Deva Veediya and Wadugodapitiya Veediya. In the game, the preview held up. Nothing came out sunk, floating or facing the wrong way. What the game did catch was street furniture: railings on the road, street lights on the asphalt, a tree in front of a board.

![Trincomalee Street](https://lankaverse.meshydra.com/media/d4-b20-street.webp "Batch 1 · Trincomalee Street, looking north from King Street")
![Trincomalee Street from above](https://lankaverse.meshydra.com/media/d4-b20-aerial.webp "Batch 1 · Trincomalee Street from the east")
![Deva Veediya](https://lankaverse.meshydra.com/media/d4-b24-deva.webp "Batch 1 · Deva Veediya")

The town went from 113 shop units to 675 today.

## Where it stands

- A second batch of twelve blocks is written and checked: the north end of Trincomalee Street, Market Street and the central market, the town lanes, both ends of Dalada Veediya, the streets round the old Bogambara prison, Keppetipola Road with the bus station, and more. They are not in the game yet. That is tomorrow's first job.
- Some roads are wrong in the map data: King Street is one narrow lane in the game and two in real life, and Trincomalee Street has too many lanes north of Hill Street. Logged, not fixed.
- A few streets have no street photos at all (President's House Road, Pillaiyar Kovil Road, the top of Temple Road). Those stay as generated buildings for now.
- The landmarks, the Temple of the Tooth first, still wait for the last step.
