The town fills in: 675 shop units
The first nine builders finished King Street, Trincomalee Street, Cross Street, Hill Street and more. The town went from 113 shop units to 675.
Blog
What I worked on, what broke and what I decided, in the order it happened. Day 1 was 30 October 2026.
1,612 visitors so far
Survey, build, connect: the work split into three stages with AI helpers side by side. The whole shop grid surveyed in about an hour.
Roads that no longer float, grass instead of sand, and the shop streets of Kandy built block by block. Then I changed how the work is done, and by the evening the town had 675 shop units.
Kandy first, street by street. Flat boxes got thrown out, and part of Yatinuwara Veediya now has real shop fronts, a real pavement and a road without a 2 m step in it.
From the clock tower to Queen's Hotel, then Colombo Street and Kotugodella Veediya. Boards on the wrong shops, and see-through vans, fixed.
Blocks 5, 6 and 7 finish Yatinuwara Veediya, both sides. And a sheet of grass that buried the town, but only from above.
The whole road went into the engine. Plants came out grey and got fixed, and the looks pass put a Sri Lankan roadside along it.